Installation and mounting

Service descrpition:

By carefully analyzing the needs of our Customers, we have extended the range of our services to include installation of our products - elements, pipelines, sewage systems both in welding and clamping technology.

We have currently finished the following projects:

  • - Sewage treatment plant in Jastrzębie Zdrój (pipe diameter: DN800, DN500, DN250 steel 304).
  • - Carbon and stainless steel installations in the port of Świnoujście (total pipeline length 3,500 linear meters).
  • - Pump station systems in the port of  Gdynia together with fittings (pipe diameter from DN100 x 3,2 to DN300 x 8).
  • - Sprinkler systems in the port of Gdynia (total system length 750 linear meters, pipe diameter from DN100 to DN350).
  • - Production and installation of linear drainage systems in the Dojlidy Brewery in Białystok.
  • - Production and installation of linear and point drainage systems, technological platforms and adjustments to existing technological lines. Production and installation of pedestals and stops.
  • - Complex works in the Dr Oetker plant in Łebcz.
  • - Production and installation of linear drainage systems, pourer casinos (part of technological lines) at the Coca Cola plant in Łódź.

Photos:

  height: 127 
  height: 127 
  height: 127